• Link to Rss this site
  • Link to Youtube
  • Link to Facebook
Application Engineering
  • Welcome
  • Research
  • Publications
  • FCM
  • Heinrich C. Mayr
  • Team
    • Visiting Academics
    • Former Team Members
    • Former PhD Students
    • Guest Students
  • Conferences
  • Contact
    • Write us
    • Impressum
  • Menu Menu

Wiedeherstellung des Trinkwassers: Informationen zum weiteren Vorgehen | Restoring the drinking water supply: Information about the next steps

December 18, 2017/in Uncategorized/by

Hauptgebäude AAU | Foto: tinefoto.com

Wir haben nun die notwendigen Informationen zur Wiederherstellung des Trinkwassers von der Bundesimmobiliengesellschaft erhalten.

Grundsätzliche Informationen zur Desinfektion:

Die Desinfektion erfolgt nun mittels Silberionen, nicht wie ursprünglich mitgeteilt mit Chlor. Das Mittel, das dabei Verwendung findet, heißt Micropur.

Bei diesem Präparat handelt es sich um einen Molekülkomplex, der bei seiner Auflösung in Wasser langsam in seine Komponenten zerfällt. Hierdurch entstehen Silberionen, die je nach Verbrauch durch den Silberkomplex nachgeliefert werden. Bakterien werden dabei zuverlässig getötet. Die Silberung von Trinkwasser zur Entkeimung ist eine seit Jahrzehnten bewährte Methode.

Die Desinfektion erfolgt in zwei Stufen:

Begonnen wird mit einer Basisdosierung, während der sie das Wasser wie gewohnt verwenden können. Sobald das Mittel eingesetzt wird, ist grundsätzlich sofort wieder Trinkwasserqualität vorhanden. Wir werden Sie jedoch noch einmal gesondert informieren, wenn die nächsten Messungen vorliegen.

Während der Semesterferien im Februar wird dann im Zentral- und im Südtrakt eine sogenannte Hochdosierung des Präparats eingesetzt. Diese wird in mehreren Schritten bereichsweise durchgeführt. Dabei wird die Wasserentnahme für 48 Stunden im jeweils betroffenen Bereich gesperrt werden. Sie müssen dann zur Wasserentnahme und zur Toilettennutzung während dieser 48 Stunden jeweils in einen anderen Trakt gehen.

Die Fachleute gehen davon aus, dass nach der Beendigung der Hochdosierungsphase NICHT mehr vonnöten sein wird, das Trinkwasser weiter mittels Silberionen zu behandeln.

Zeitplan:

Ab Dienstag, 19. Dezember wird in den betroffenen Bereichen (Südtrakt, Zentraltrakt, Nordtrakt, USI) mit der Basisdosierung der Desinfektion mittels Micropur begonnen. Diese Basisdosierung ist völlig ungiftig, damit sollte die Trinkwasserqualität grundsätzlich wiederhergestellt sein. Wir werden Sie jedoch darüber noch einmal gesondert informieren, wenn die nächsten Messungen vorliegen.

Die Hochdosierung erfolgt bereichsweise im Februar 2018 während der Semesterferien und dauert je Bereich 48 Stunden. Während dieser Zeit wird in den jeweils betroffenen Bereichen keine Wasserentnahme möglich sein. Wir bitten dafür um ihr Verständnis.

Leitungserneuerung und Entfernung von Totleitungen

Im Nordtrakt wurden inzwischen alle Leitungen erneuert, auch die Zuleitungen von der Kaltwasserzentrale. Im Nordtrakt werden Anfang dieser Woche Proben entnommen, um festzustellen, ob das Pseudomonaden-Problem dadurch gelöst worden ist und im Bereich des Nordtrakts eventuell keine Hochdosierung mehr notwendig ist. Das Ergebnis der Analyse sollte noch vor Weihnachten vorliegen.

Im Südtrakt und im Zentraltrakt werden bis zum Beginn der Hochdosierung im Februar alle aufgefundenen Totleitungen entfernt.

 


 

We have now received the necessary information concerning the restoration of the drinking water supply from the owner of the buildings, the Bundesimmobiliengesellschaft.

 

General information about the disinfection measures:

The disinfection will be carried out by means of silver ions, rather than with chlorine, as initially intended. The specific solution to be deployed is called Micropur.

This preparation is a molecular complex that gradually dissolves into its constituent parts when it is dispersed in water. This process produces silver ions, which are re-supplied by the silver complex, depending on the intensity of the consumption. Bacteria are reliably destroyed. The use of silver to decontaminate drinking water has served as a tried and tested method for decades.

Disinfection will be achieved in two stages:

The first step involves a basic dosage, during which you can continue to use the water as usual. As a general rule, when the solution enters the system, drinking water quality is achieved with immediate effect. We will nonetheless advise you in a separate message, once the next set of test results becomes available.

During the semester holidays in February, a so-called elevated dosage of the solution will be deployed in the Southern Wing and in the Central Building. This will be carried out in several stages, area by area. The water supply (taps and WCs) will be shut off for a period of 48 hour in the respective affected area. During this 48-hour treatment phase, please use the facilities in other parts of the building.

The experts assume that upon completion of the elevated dosage stage, there will be no need for further treatment using silver ions.

Schedule:

Treatment of the affected areas (Southern Wing, Central Building, Northern Wing, USI Building) applying the basic disinfection dosage of Micropur will commence as from Tuesday, 19th December. This basic dosage is absolutely non-toxic, and it is expected that drinking water quality will be restored immediately. Nonetheless, we will provide separate information, when the next text results become available.

The elevated dosage will be deployed area by area during February 2018, scheduled to coincide with the semester holidays. In each area affected, the treatment will last for 48 hours. During this time, it will not be possible to use the water in the affected areas. Thank you for your understanding.

Renewal of pipes and removal of dead ends  

All pipes supplying water in the Northern Wing have been replaced with new pipes, including all the pipes supplying water from the central cold water plant. Samples will be taken from points throughout the Northern Wing early this week, to establish whether the pseudomonas problem has been successfully resolved with this measure, thus possibly avoiding the need for an elevated dosage in the Northern Wing. The results of these tests are expected before Christmas.

Meanwhile, work will continue in the Southern Wing and the Central Building to ensure as best as possible that all remaining dead end pipes are removed before the elevated dosage is scheduled to be deployed in February.

Der Beitrag Wiedeherstellung des Trinkwassers: Informationen zum weiteren Vorgehen | Restoring the drinking water supply: Information about the next steps erschien zuerst auf Alpen-Adria-Universität Klagenfurt.

Source: AAU TEWI

Tags: news
Share this entry
  • Share on Facebook
  • Share on X
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Tumblr
  • Share on Vk
  • Share on Reddit
  • Share by Mail
https://ae-ainf.aau.at/wp-content/uploads/2017/12/Alpen-Adria-Universita¦êt-Klagenfurt-Architektur-tintefoto.com_-80x80-1.jpg 80 80 https://ae-ainf.aau.at/wp-content/uploads/2017/01/logo3_black-300x78.png 2017-12-18 09:08:362017-12-18 09:08:36Wiedeherstellung des Trinkwassers: Informationen zum weiteren Vorgehen | Restoring the drinking water supply: Information about the next steps
You might also like
Professor of Statistics (f/m) at the Department of Statistics, Faculty of Technical Sciences
1+2+4+8 = Happy 70th Birthday
Two master thesis in field of eMedication in progress
We’re going to PerCom18 to Athens
Postdoc-Assistentin / Postdoc-Assistent am Institut für Erziehungswissenschaft und Bildungsforschung – Kennung 679H/18
Search for a Student Assistant !!!
Andrea Tonelleo was honored with the Aerospace Best Paper Award
Guest lecture by Helen Spencer “Researching (im)politeness in intercultural interaction”

Archive

  • May 2020
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • June 2017
  • February 2017
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016

Categories

  • ae.INFORMATIK
  • AINF
  • Allgemein
  • Alpen-Adria-Universität Klagenfurt
  • Gesellschaft für Informatik
  • Highlight
  • Impressionen
  • INFORMATIK2016
  • Institut
  • ITEC
  • KI2016
  • Mates
  • Medienpräsenz
  • Menschen
  • News
  • PR_AINF
  • PR_Application Engineering
  • Seitenblick
  • Skill
  • Tutorial
  • Uncategorized
  • Veranstaltung
  • Vortrag
  • Workshop
© Copyright - Application Engineering - Enfold WordPress Theme by Kriesi
  • Link to Rss this site
  • Link to Youtube
  • Link to Facebook
  • Campus-System
  • Employees-Portal
  • Moodle
  • Youtube-Channel
  • Impressum
Link to: 43. Österreichische Linguistiktagung Link to: 43. Österreichische Linguistiktagung 43. Österreichische Linguistiktagung Link to: Jahrestagung: Kommunales Wirtschaftsrecht 2017 Link to: Jahrestagung: Kommunales Wirtschaftsrecht 2017 Jahrestagung: Kommunales Wirtschaftsrecht 2017
Scroll to top Scroll to top Scroll to top

Nächste interaktive ULG-Vorstellung:

 tba
Nehmen Sie an unsrem Meeting per Computer oder Smartphone teil.
https://global.gotomeeting.com/join/223661045

Zum ersten Mal bei GoToMeeting?

Hier können Sie eine Systemprüfung durchführen:
https://link.gotomeeting.com/system-check